Hello,
So, I have a bunch of data that was stored in a spreadsheet and I need to import it into "Leads", but have it reflect the "Created on" date that is has on the spreadsheet.
I can find guides, I have updated the security permission to allow me to override the date. For some reason though I cannot seem to get the created on date to change what so ever.
Possible I'm doing it in the wrong order?
I either import a new record from scratch with what ever date I want, and all is well?
Or
I upload it normally, then export it, alter the date, import with "Allow duplicates" ticket?
Either way I do not see the date changing.
Many thanks
David